A branch on a previously executed main line
Specifications
If no sections are available in an old public sewer network to which a branch is to be added for the purposes of home connections, the branches are installed as follows:
- A hole is made in the main line using a drilling machine
- Ring B is placed inside the hole
- Add the lard
- The tail of the subpiece enters the B ring slot
Where we obtain a tight connection taking into account the following:
A- The branch piece must not protrude inside the main pipe and its end must be identical to the curvature of the inner surface of the main pipe.
B- There are two types of drilling tools, one for a 45-degree incline and the other for a 90-degree straight hole. Both types can be installed on an electric machine or a pneumatic machine.
City
Riyadh Region
Founded Date
20-01-2022
License Number
1010609539
Industries
Join Us
A robust platform connecting buyers and factories, fostering global trade through diverse products and secure transactions.